Tuesday, August 21, 2018

Bangert Pool, Florissant



Location: 275 S. New Florissant Rd, Florissant, MO 63031

Website: http://www.florissantmo.com/topic/subtopic.php?topicid=27&structureid=20


Bangert Pool, located inside Bangert Park, is Florissant’s outdoor swimming pool. This pool has a zero depth entry, water play structure, Aqua Zip’N, 1 and 3 meter diving boards, splash pad and large open swimming area. 

Their normal hours are 12:30 to 7:30 during the week and 11:30 - 7:30 on weekends. Their rates for non residents are $10 for adults and $8 for kids 4-17, kids under 4 are free. They do have a tot time during the summer on Monday and Wednesday for kids 6 and under, check the website for current dates and times. 



The pool is very long with the zero entry and kids playground at the south end. The pool gets deeper as you go north. The deep end has 2 diving boards and lap lanes. There is a big tube slide that you have to be 48" to go down. There is also 1 smaller slide. There is a splash pad area but it wasn't turned on when I was there.




There used to be 2 small blue slides but now there is only one. It says max 225 pounds.



The children's play structure was fun! Lots of fountains, a tunnel, sprayers, and a slide. 


Splash pad area



Concession stand


Zero entry area with pop jets










Deep end


2 diving boards











Monday, August 20, 2018

Brad L. Schultz, Jr. Memorial Park, Village of Riverview


                            


Location: 10045 Toelle Ln., Riverview, MO 63137

Website: http://www.riverviewmo.org/Street.aspx

Playground Ground Cover: Wood chips


This is a very small park with older equipment. It's named after a police officer who was killed in the line of duty in 2004. There is a stand-alone metal slide, and a play structure for littles and one for bigs. The park has playground equipment, a pavilion, picnic tables, benches, and a water fountain. There are no restrooms which is a bummer. The smaller play structure has a steering wheel and a slide. The larger one has ramps, a pretend window, some slides, and a tic-tac-toe board.











Saturday, August 18, 2018

Belgrove Park, Bellefontaine Neighbors



Location: The corner of Belgrove and Bellabrook Dr., Bellefontaine Neighbors, MO 63137

Website: https://www.cityofbn.com/departments/parks-and-recreation/park-reservations/belgrove-park

Playground Ground Cover: Wood chips

This is a small old playground and there are no restrooms here. It's on a quiet residential street.


Old bent monkey bars


Swing and picnic bench


 View from the parking lot. Lots of spaces and not busy. 




There are 4 rocking horses and a seater teeter totter


Old cannon





The larger play structure has several slides, and lots of bars and poles. 


The smaller play structure has a bridge, a couple slides, a steering wheel, and a few bars and poles.



Friday, August 17, 2018

Bissell Hills Park, Bellefontaine Neighbors



Location: 10237 Ashbrook Dr., Bellefontaine Neighbors, MO 63137

Website: https://www.cityofbn.com/departments/parks-and-recreation/park-reservations/bissell-hills-park

Playground Ground Cover: Poured rubber

This is an old playground and there are no bathrooms right now. The park is currently under construction. The City of Bellefontaine Neighbors received a grant for $420,000.00 for the renovation of Bissell Hills Park from the Municipal Park Grant Commission. For the last 3 years the City’s Parks and Recreation Board and the community have worked with SWT Design on the renovation of its park and recreation facilities and finished the Master Plan of Bissell Hills Park in 2016. This is a matching grant and the City is supplying in-kind labor and money towards the project. The first phase of the project is the demolition of the tennis courts, ball fields, restrooms and shelter. Once complete, a new shelter and restrooms will be constructed and some trails through the park along with landscaping will be installed. The play ground will remain the same. The time line on the project is having a contractor selected by June, begin work in July and the first phase of the project completed by the end of the year.


There is one big play structure, and it has several slides, a maze wall, and lots of bars and poles.








Area that will have the new bathrooms and pavilion.


There are 2 bucket swings and 2 sling swings. The poured rubber needs to be replaced.


There are 2 rocking horses and a 4 seater teeter totter